Topic
3D Time Frequency Strectrum Plot – Calendar Time
Page d'accueil ' Communauté ' Généralités ' 3D Time Frequency Strectrum Plot – Calendar Time
- Ce sujet contient 2 réponses, 2 participants et a été mis à jour pour la dernière fois par John Huxtable, le il y a 13 années et 8 mois.
-
AuteurMessages
-
29.08.2011 à 12:11 #34332John HuxtableParticipant
Hi,
I have produced a 3D Time Frequency Strectrum Plot for a single time series.
For some reason I cannot get the time axis to display “calendar time”, instead it displays the value in seconds (i.e. 1310283600 instead of 10/07/2011 08:36:40). When I look at the data set that the 3D display is based on, the X column is formatted correctly but this does not carry through to the 3D display.
Can you help?
29.08.2011 à 12:11 #34334John HuxtableParticipantHi,
I have produced a 3D Time Frequency Strectrum Plot for a single time series.
For some reason I cannot get the time axis to display “calendar time”, instead it displays the value in seconds (i.e. 1310283600 instead of 10/07/2011 08:36:40). When I look at the data set that the 3D display is based on, the X column is formatted correctly but this does not carry through to the 3D display.
Can you help?
30.08.2011 à 15:01 #34333AnonymeInactifWe cannot reproduce this behavior using FlexPro 9.0.9. Please address to support@weisang.com and give us the exact version number of FlexPro you are using and your license information.
Support
support@weisang.com -
AuteurMessages
- Vous devez être connecté pour répondre à ce sujet.